I'm only really starting this build but wanted to give credit where credit is due.
I'm starting with just a eBay frame that I got for $215.00 shipped. Came with a BOS but I was able to get it titled for an additional $65.00. Have a member here possibly hooking me up with a roller so I'm crossing my fingers that that works out.

Here the Y is removed. As you can see in the pics, I followed the angle of the bottom of the Y.


Mounts removed. I won't bother cleaning these anymore than this.

Drilled out the plug welds with a 1/2" bit and cleaned the Y up.


Removed the engine guard mount from the left side and cleaned up the frame rail. I'll reuse the mount later for the pipe mount.


I placed the Y underneath and estimated how much I would need to cut the downtube to be around where others have placed their Y and scribed the downtube. I left my Y full thickness and only relieved the downtube.


The Y basically where I want it with some relief around it for welding. The sides are thin so, thankfully, required very little work. The back is a bit thicker but roughly half as thick as the front. With that in mind, more work was done on the front.

In the pic above, the Y looks a bit low since I followed the original shape of the Y when I cleaned it out. If you look at the pics below, you get a better idea of how high it is. I'm going to notch the frame by the right footpeg so I "think" that this should be good.



Well, that's it for now. Like Bob, I'll use some 1" stock from Home Depot for mocking up the extensions so I plan to get that tomorrow. My 3/4" stock is a bit proud of that so I'll need to trim that down some before it's ready.