


The forward Trunion that I do is near the center and above the blue tape.

Forward Trunion with unmachined main landing gear holes.

The Trunion thats drilled from scratch.

The Titanum floor details as if you were standing on the floor looking down.

Then as it is during my assembly process, the whole dam thing is upside down in this position just like the ceiling pics.

Looks pretty easy doesn't it.
