i finely got my camera fixed so no more camera phone pics.
it sucks waiting for parts, but i been trying to get some stuff done. almost everything to finish it up will be here this friday. just have to wait for the crank to get done, and ill be finishing this up.
here is the engine mounts welded up. i filled the side of the front mounts to get the bolt to sit flush with the side of the frame. fits like a glove. you can also see the front pipe mount welded.
coil mounted
i re did the rear pipe mount like what service honda does, it fits almost perfect without putting too much stress on the pipe. only problem is i now have to modify all my other pipes the same way

the subframe mount is the stock crf exhaust mount. just need to make a bushng to use a 6mm bolt.
i modified the gas tank, and moved the petcock. it is now at the lowest point of the tank. i screwed up and moved it too far, and split it at and edge. some epoxy and ill find out if the petcock leaks. i used a salamander heater to heat the tank up. next time i will use a heat gun so i can focus the heat more on a particular spot. this is only temperary, the tank has 2 stipped shroud holes, and i want a bigger tank. this will get it done so i can fire it up and start playing with the suspension. it will be changed before the first race.
